Power Plants
Power plants consists of solar and wind power plants and is stated at cost. Expenditures for major additions and improvements are capitalized and minor replacements, maintenance, and repairs are charged to expense as incurred. When power plants are retired, or otherwise disposed of, the cost and accumulated depreciation are removed from the consolidated balance sheets and any resulting gain or loss is included in the results of operations for the respective period. Depreciation of power plants is recognized using the straight-line method over the estimated useful lives of the power plants of up to 30 years.
Viability Gap Funding Subsidies

Four of our solar power plants in India (NSM Suryalabh, NSM Sitara, NSM L'Volta and Focal) are entitled to receive viability gap funding support in an amount determined through a competitive bidding process. The viability gap funding support is funded by India’s National Clean Energy Fund and is paid by the offtake counterparty to these solar power plants, the Solar Energy Corporation of India (“SECI”), a not-for-profit company established by the Ministry of New and Renewable Energy to facilitate solar energy generation capacity in India. The program is expected to provide viability gap funding subsidies to the applicable four solar power plants in the aggregate amount of INR 1,189.4 million, 50% of which is payable as early as three months after each power plant's commissioning, and 10% of which is payable each year for five years thereafter, subject to the plant meeting certain requirements. SECI is contractually obligated to establish an irrevocable letter of credit to secure its payment obligations under the PPA. Additionally, SECI is required to hypothecate the revenues it receives under its back-to-back power sale agreement with local utilities to the project.
The Company recorded the awarded viability gap funding in full as a reduction to the cost of power plants in service, with a $10.7 million receivable included in current other assets, and $7.1 million included in other assets in the consolidated balance sheet as of December 31, 2015. The current portion of the viability gap funding includes the initial 50.0% receivable following the solar power plant’s commercial operation date and the 10.0% receivable in first year thereafter. The initial 50.0% receivable, or $8.9 million, was received in cash subsequent to December 31, 2015. The remaining portion of the current receivable is due before December 31, 2016.
Impairment of Long-lived Assets
Long-lived assets that are held and used are reviewed for impairment whenever events or changes in circumstances indicate carrying values may not be recoverable. An impairment loss is recognized if the total future estimated undiscounted cash flows expected from an asset are less than its carrying value. An impairment charge is measured as the difference between an asset’s carrying amount and fair value with the difference recorded in operating costs and expenses in the statement of operations. Fair values are determined by a variety of valuation methods, including appraisals, sales prices of similar assets and present value techniques. There were no impairments of long-lived assets recognized during the years ended December 31, 2015, 2014 and 2013.
Intangible Assets
Intangible assets that have determinable estimated lives are amortized over those estimated lives. The straight-line method of amortization is used because it best reflects the pattern in which the economic benefits of the intangible asset are consumed or otherwise used up. The amounts and useful lives assigned to intangible assets acquired impact the amount and timing of future amortization. Reviews are performed to determine whether the carrying value of an asset is impaired, based on comparisons to undiscounted expected future cash flows or some other fair value measure. If this comparison indicates that there is impairment, the impaired asset is written down to fair value, which is typically calculated using discounted expected future cash flows utilizing an appropriate discount rate. Impairment is based on the excess of the carrying amount over the fair value of those assets. There were no impairments of intangible assets recognized during the years ended December 31, 2015, 2014 and 2013.
Capitalized Interest
Interest incurred on funds borrowed to finance construction of power plants is capitalized until the system is ready for its intended use. The amount of interest capitalized within power plants within the Company's consolidated balance sheets was $1.8 million and $1.6 million, during the years ended December 31, 2015 and 2014, respectively.
Deferred Financing Costs
Financing costs incurred in connection with obtaining construction and term financing are deferred and amortized over the maturities of the respective financing agreements using the effective-interest method. Amortization of deferred financing costs is capitalized during construction and recorded as interest expense in the consolidated statements of operations following