Print Page  |  Close Window

SEC Filings

10-K
TERRAFORM GLOBAL, INC. filed this Form 10-K on 12/21/2016
Entire Document
 

specific cash flow issues for which stakeholders have indicated to the FASB that a diversity in practice existed in how entities
were presenting and classifying these items in the statement of cash flows. The issues addressed by ASU No. 2016-15 include
but are not limited to the classification of debt prepayment and debt extinguishment costs, payments made for contingent
consideration for a business combination, proceeds from the settlement of insurance proceeds, distributions received from
equity method investees and separately identifiable cash flows and the application of the predominance principle. The
amendments of ASU No. 2016-15 are effective for public entities for fiscal years beginning after December 15, 2017 and
interim periods in those fiscal years. Early adoption is permitted, including adoption in an interim fiscal period with all
amendments adopted in the same period. The adoption of ASU No. 2016-15 is required to be applied retrospectively. The
Company is currently evaluating the impact of the standard on its consolidated statements of cash flows.
In October 2016, the FASB issued ASU 2016-16, Income Taxes (Topic 740): Intra-Entity Transfer of Assets Other Than Inventory, which eliminates the recognition of current and deferred income taxes for an intra-entity asset transfer until the asset has been sold to an outside party exception for an intra-entity transfer of an asset other than inventory. ASU 2016-16 is effective for annual periods beginning after December 15, 2017, and for annual periods and interim periods thereafter with early adoption permitted. The Company is evaluating the effect of ASU 2016-16 on its consolidated financial statements.
In October 2016, the FASB issued ASU 2016-17, Consolidation (Topic 810): Interests Held through Related Parties That Are under Common Control. ASU 2016-17 updates ASU 2015-02. Under the amendments, a single decision maker is not required to consider indirect interests held through related parties that are under common control with the single decision maker to be the equivalent of direct interests in their entirety. Instead, a single decision maker is required to include those interests on a proportionate basis consistent with indirect interests held through other related parties. ASU 2016-17 is effective for annual periods beginning after December 15, 2017, and for annual periods and interim periods thereafter with early adoption permitted. The Company is evaluating the effect of ASU 2016-17 on its consolidated financial statements.
3. ACQUISITIONS

2015 Acquisitions
Acquisition of Honiton
On May 14, 2015, the Company completed the acquisition of 100.0% of the outstanding shares of Honiton Energy XIL Holdings Limited (“Honiton XIL”) and Honiton Energy BAV Holdings Limited (“Honiton BAV”) and together with Honiton XIL, “Honiton”) from Honiton Energy Caymans Limited. Honiton operates three wind power plants located in China with an aggregate net capacity of 148.5 MW. The aggregate consideration paid for this acquisition was $109.1 million in cash, which was funded with proceeds from the Private Placement offerings (see Note 13- Stockholders' Equity for additional information on the Private Placement offerings.)
As further described in Item 15. Note 17 - Commitments and Contingencies, the Company was subject to pending litigation proceedings with Suzlon Energy (Tianjin) Limited (“SETL”) with respect to alleged breaches of a turbine supply contract relating to the Honiton wind power plants in China. The operation and maintenance service contracts claim pending before an arbitral tribunal was resolved on December 3, 2015, pursuant to which the Company was required to pay an award of approximately $0.5 million, which was paid in January 2016. On June 3, 2016, SETL and the Company reached a settlement resolving all remaining disputes relating to the turbine contracts. The terms of this final settlement resulted in SETL assigning all rights as a creditor it held against the Company to Beijing Aliyun Investment and Consulting Co. Ltd. (“Aliyun”). In addition, the Company agreed to pay Aliyun $7.1 million (RMB 47.0 million), of which RMB 45.0 million was paid during the second quarter of 2016, and the remaining RMB 2.0 million is due no later than July 2018, subject to various conditions set forth in the settlement agreement. In accordance with the settlement agreement, SETL withdrew its pending claims against the Company. As of December 31, 2015, a liability was recognized related to the proceedings in the amount of $8.4 million (RMB 54.4 million).
Acquisition of NSM 24
On June 9, 2015, the Company completed the acquisition of a 51.0% equity interest in SEI Solar Power Private Limited (“NSM 24”) from Astronergy Solar Korea Co. Limited. NSM 24 owns a solar power plant located in India with an aggregate net capacity of 24.0 MW. The aggregate consideration paid for the acquisition of this interest was $9.1 million in cash.
Concurrently, SunEdison contributed its 49.0% equity interest in NSM 24 to the Company, which was remeasured from SunEdison’s historical cost basis to fair value of $8.7 million at the time of the acquisition. Accordingly, the NSM 24 acquisition was accounted for as a step acquisition, and the Company recognized a gain of $1.4 million related to the


147